top of page
Dự án Btech Solutions

PROJECT INFORMATION 

JTC BULIM PHASE 2

Client
Address
Type
Stage
QFA

SWA
Singapore
Pedestrian Street
Design Phase
The project included the construction of roads, ditches, viaducts, etc with
an area of more than 20 hectares. At the same time, a 200-meter-long
excavated tunnel would be built to connect with Wulin Square. The project
covered the construction of 0.2 sq.km area field.

Services:

  • Site Modeling

  • Road Modeling

  • Drain Modeling

  • Server Modeling

bottom of page